Daylight Window

Build a bench prototype first

0. Confirm the installation route

Photograph and measure the room wall, floor, ceiling, relevant windows, doors and outlets. A recessed trial needs a confirmed clear stud bay with suitable structure, cavity depth, wiring clearance and moisture conditions. Use the surface-mounted version if the wall is unsuitable for a recess. Both versions need a suitable mounting substrate, access to the equipment and a validated low-voltage route. Keep studs continuous. Resolve bedroom, electrical and fixture requirements before installation.

1. Build a 12 × 12 in optical sample

Fit the candidate tape to representative aluminum carriers and use offcuts of the planned acrylic and reflective backing. Compare 1.5–2.0 in diffuser spacing at the planned strip pitch and try a second optical film if bands remain visible. Capture photos at fixed exposure in bright and dim room conditions. Check strip, aluminum, housing and acrylic temperatures after stabilization at maximum planned sustained output, including the limiting warm/cool mix. Revise the heat path or reduce the planned ceiling if materials or electronics exceed suitable limits. Repeat with the full enclosure before integrating it into the wall.

2. Verify the low-voltage control path

Choose a 24 V common-anode analog CCT COB strip and a matching two-output PWM controller. Confirm the pinout, cut pitch, current ratings, protective devices, wire and supply with the selected hardware and a qualified reviewer. Plan for about 73 W DC before margin using the brief's 16 W/m assumption. Size from the verified load. Keep the power supply and controller accessible and ventilated away from the cavity. Make changes with the supply disconnected. Test the warm-white and cool-white channels individually before testing combined output. BTF-LIGHTING example strip family · WLED analog compatibility

At the existing living-room window, place the AS7341 where it sees representative daylight. Connect it over I²C to an ESP32. Start with 30–60-second readings, then tune empirical brightness and white-tone mappings and a 2–5 minute smoothing time. Test a darkness threshold with hysteresis. When samples go stale, the fixture should fade to off after a defined local timeout. Verify a local manual control that continues to work during Wi-Fi loss, including a local off command. Implement and verify the timeout on the fixture controller. WLED's API is an optional transport once compatible analog hardware and local fail behavior are verified. Adafruit AS7341 breakout · ESPHome AS734x · WLED local JSON API

3. Dry-fit and test the full enclosure

Rip the perimeter stock to the 2.50 in nominal depth and dry-fit the four rails. Fit the reflective backing and the aluminum carriers to a mechanically suitable support. Trim four roughly 45 in runs at manufacturer marks and route three conductors per run to the common +24 V, warm-white PWM and cool-white PWM buses. Provide protected routing and strain relief at the lower exit. The diagram describes interfaces and routing intent. Final protection, terminations and equipment selection depend on the verified installation.

Fit the removable front cassette. The white outer casing, stepped inner reveal and center muntin create the two sight openings. The gaskets cushion the front edges of two cut-to-fit acrylic inserts. Screw-fixed stops from the back of the cassette retain both inserts. Plan removable casing attachment with fasteners reachable from the room side. Keep enough slack and clearance, or a suitable disconnect, for servicing in the agreed low-voltage route. Dry-fit before finishing so the acrylic can expand, sit squarely and be removed without damage.

4. Mount and calibrate

Install only after the wall, ventilation, egress, fixture and electrical requirements have been checked. Confirm square, secure attachment, a serviceable front, accessible electronics and suitable cable protection. Recheck sustained temperature and optics with the assembly mounted. Log daylight behavior on a clear day, in cloud cover and after dark. Revisit thresholds and brightness limits with the installed sensor's actual readings.

Budget

The brief targets $225 for a straightforward DIY unit with some supplies on hand and a compatible bundled power supply. Its planning range is $200–280. Adding each line's low endpoints yields $193, and adding each high endpoint yields $325. The latter can occur if several parts need upgrading or a separate supply is required. The optional sill and professional or permit costs sit outside the base allowance. The BOM records planning figures and pending source and purchase fields.